QuickStart

Engineered for injection

Built for long, high-pressure horizontal completions, the QuickStart Inject + Frac Valve from Nine Energy Service provides an initial point for formation breakdown.

Contact Sales
20,000
+ psi
Burst-pressure rating

Rugged and proven, Nine’s QuickStart features a one-piece mandrel design. Engineered to withstand burst pressures above 20,000 psi, it provides an initial point to break down the formation and establishes a pump-in port for use in horizontal completions. 

IMPROVES INJECTIVITY

High-velocity Port Jetting™ penetrates the near-wellbore formation, increasing formation contact area and allowing for improved fluid placement and distribution.

MAINTAINS INTEGRITY

Mandrel design with TORQ Thru Technology maintains casing string integrity and yield torque ratings. For ease of makeup, the tool can be through-torqued onto the casing string.

RESISTS PLUGGING

The opening sequence is controlled by a fit-for-purpose special rupture disc designed to resist plugging or bridging at the membrane.

QuickStart
Dig Deeper

Control meets efficiency

We're standing by

With locations near all the critical plays in North American basins, Nine can deploy fast and cost-effective completion solutions. Let’s talk.