SmartStart PLUS®

Intelligence adds up

Packing lots of utility in a small footprint, the SmartStart PLUS Time Delay Test + Frac Valve delivers a reliable and cost-effective alternative for long, horizontal stage-1 completions.

Contact Sales

6 wells. 8 hours.
No Kidding.

Improve formation connectivity

A time-delayed, pressure-activated sliding sleeve, SmartStart PLUS eliminates the need for tubing-conveyed perforation on toe-stage completions. Featuring precision-ported jetting, it provides an initial point to break down the formation, it establishes a pump-in port for long horizontal completions—helping you meet maximum pressure-test requirements.

SIMPLIFIES COMPLETIONS

With SmartStart PLUS, a wide range of functionality is packaged into one precision solution, streamlining the process and number of components required.

BUYS TIME

Optional delay setting of 15, 30, 45 or 60 minutes between device activation and the opening of the ports gives the operator time to reach a predetermined casing test pressure.

SAVES MONEY

Precision timing and porting of pressure jets boosts efficiency of completions, dramatically minimizing the need for rework or remedial actions, along with associated costs.

SmartStart Plus
Dig Deeper

All-in-one performance

We're standing by

With locations near all the critical plays in North American basins, Nine can deploy fast and cost-effective completion solutions. Let’s talk.